Summary
Overview
Work History
Education
Skills
Accomplishments
CORE CAPABILITIES
INDUATRIAL TRAINING
DECELERATION
Timeline
Generic
Md. Abdul Aziz

Md. Abdul Aziz

Koirakola, Balochar, Sirajdikhan, Munshigonj

Summary

Production In-Charge leading kiln operations, quality control, and maintenance for ceramic production lines. Improves output by managing raw material checks, final product quality, budgeting, and cost analysis while keeping machinery running to plan. Drives process changes that raise efficiency and protect product standards.

Overview

2
2
Languages
11
11
years of professional experience

Work History

Production In-Charge

Eco Ceramics Industries Limited
11.2020 - Current
  • Maximized production efficiency to meet targets.
  • Ensured the quality of raw materials and final products.
  • Supervised the maintenance of all factory machinery.
  • Managed cost analysis and budgeting for production.
  • Implemented process improvements for better efficiency.
  • November 2020 - Present (3 years 9th Month Running)

In-Charge (Kiln & Laboratory Section)

SAS Building Materials Limited
10.2017 - 11.2020
  • Managed kiln operations and firing control, optimizing coal-fired systems.
  • Conducted quality control tests on clay components and materials.
  • Supervised dryer functions and kiln cart loading processes.
  • Performed calorific value tests for coal and clay.
  • Led a team, ensuring adherence to safety protocols and best practices.
  • October 2017 – November 2020 (3 Years 1 Month)

Shift In-Charge (Kiln & Laboratory Section)

STONE BRICKS LTD.
01.2016 - 08.2017
  • Managed kiln operations during shifts for optimal performance.
  • Controlled the firing curve to ensure product quality.
  • Conducted quality control checks and laboratory tests.
  • Supervised kiln operators and lab technicians.
  • Ensured adherence to safety protocols and procedures.
  • Implemented process improvements to enhance efficiency.
  • January 2016 - August 2017 (1 Years 8 Month)

Sub Assistant Engineer (QC Section)

X-Monika Tiles Industries Limited
04.2015 - 01.2016
  • Assisted in quality control processes to ensure product standards were met.
  • Conducted routine inspections of raw materials and finished products.
  • Monitored production lines to maintain operational efficiency.
  • Supported the implementation of quality assurance protocols.
  • Collaborated with the production team to resolve quality-related issues.
  • April 2015 - January 2016 (9 Month)

Education

Diploma in Engineering - Ceramic Technology

Bangladesh Institute of Glass & Ceramics
01-2014

Secondary School Certificate (Dakhil) - Science

Baragope Islamia Fazil Madrasah
01-2010

Skills

Kiln operation management

Production scheduling

Process optimization

Resource allocation

Production efficiency improvement

Quality control and assurance

Laboratory analysis

Machinery maintenance

Raw material testing

Accomplishments

  • Reduced coal consumption per brick
  • Reduced clay consumption per brick
  • Reduced kiln and dryer heat loss
  • Improved brick strength
  • Enhanced brick color
  • Increased brick drying capacity

CORE CAPABILITIES

  • Ability to meet any challenge with confidence, determination & sincerity.
  • Enjoy working under pressure, in different challenging and creative situations.
  • Hard-working capability and retain temperament.
  • Ability to learn quickly and implement efficiently.

INDUATRIAL TRAINING

  • Protic Ceramics Industries Limited
  • Fu-Wang Tiles Ceramics Limited
  • Bangladesh Insulator and Sanitary Factory Limited
  • Bangladesh Council of Scientific and Industrial Research (BCSIR)
  • Bangladesh Institute of Ceramics and Ceramics.

DECELERATION

I announce that the information and details shared in this resume are correct and inclusive. I take full liability for the correctness of the information. Sincerely Md. Abdul Aziz

Timeline

Production In-Charge

Eco Ceramics Industries Limited
11.2020 - Current

In-Charge (Kiln & Laboratory Section)

SAS Building Materials Limited
10.2017 - 11.2020

Shift In-Charge (Kiln & Laboratory Section)

STONE BRICKS LTD.
01.2016 - 08.2017

Sub Assistant Engineer (QC Section)

X-Monika Tiles Industries Limited
04.2015 - 01.2016

Secondary School Certificate (Dakhil) - Science

Baragope Islamia Fazil Madrasah

Diploma in Engineering - Ceramic Technology

Bangladesh Institute of Glass & Ceramics
Md. Abdul Aziz