Responsible for preparation of Cost Estimate (Budget), correspondence to Procuring Entity, preparing work schedule, method statement of the proposed works (As per requirement of Tender Schedule), cost estimate of the project, variation of the bill of quantities, preparation of bills of Quantities, etc.
Also, work with arbitration team.
Achieve Special training on e-GP system.
Supervision of nearest project from Dhaka Head Office.
Also dealing with Officers of Roads & Highways Department, other clients and Consultants.
The Organization is a national Group of Companies. The average annual construction turnover of this company is over Tk.5360 million.
Project Coordinator
Wahid Construction Ltd.
Dhaka
06.2019 - 10.2023
Improvement of Important Zilla Highways under Sylhet Zone to Appropriate Level of Standard & width (under Sylhet Zone) Project.
I) Improvement of Fenchuganj-Maijganj-Palbari Road Z-2020 by Reconstruction of Flexible Pavement Construction of Rigid Pavement from Ch. 1.651 to 5.378 Construction of Culverts 4 Nos. 1 No. x 3.00m x 7.32m and 3 Nos. x 2.00m x 7.32m Including other ancillary works RCC U-Drain with cover slab & Masonry U-Drain with cover slab under Sylhet Road Division of Road Zone Sylhet during the year 2018-2019. Package No. WD-4, Tender ID -219660
Ii) Improvement of Sylhet Telikhal- Sultanpur-Balaganj Road Z-2013 by Reconstruction of Flexible Pavement, Construction of Rigid Pavement Including other ancillary works RCC U-Drain with cover slab & Masonry U-Drain with cover slab RCC Retaining wall Brick Toe wall CC Block with Geo-textile under Sylhet Road Division of Road Zone Sylhet during the year 2018-2019. Package No. WP-4, Tender ID - 219670
Iii) Improvement of Kulaura-Prithimpasha-Hazipur-Sharifpur Road and Link Road Robir Bazar to Tilagaon Road Z-2822 by widening & surfacing Ch. 0.000 Km to Ch. 8.135 Km Ch. 8.890 Km to Ch. 12.800 Km and Link to Robir Bazar to Telagaon Ch. 0.000 Km to Ch. 4.200 Km Strengthening and Surfacing of Existing Pavement Ch.8.890 Km to Ch 12.800 Km and other ancillary works Protective works Surface Drain and Sign Signal Km post etc. under Moulvibazar Road Division of Road Zone Sylhet during the year 2018-2019. Package No. WD-09.
Iv) Improvement of Juri-Fultola-Batuli Road (Z-2823) by Widening Strengthening & Surfacing Strengthening and Surfacing of existing Pavement, New Construction, Re-Construction, Rigid Pavement, Different size 19 Nos. Culvert at Different Km and other ancillary works Surface Drain RCC U-Drain with cover slab Protective wall Retaining wall and Sign Signal Km post etc. under Moulvibazar Road Division of Road Zone Sylhet during the year 2018-2019. (Package No. WP-09), Tender ID No. 219401.
Responsible for preparation of cost estimate, advice making IPC, variation, Supervise to execute all the work according to the design and Drawing.
Consult with Project Manager about progress of work and target progress.
Solve any discrepancy in drawing and design by discussion or raising RFI to consultant/Client.
Deputy General Manager(Construction)
Wahid Construction Ltd.
Dhaka
07.2016 - 10.2023
Solely responsible for preparation of Tender documents (GOB Funded & Foreign Aid Project), Cost Estimate, Selection of tender for submission, attend pre-bid meeting, correspondence to Procuring Entity, preparing work schedule, method statement of the proposed works (As per requirement of Tender Schedule), cost estimate of the project, variation of the bill of quantities, preparation of bills of Quantities, Checking Sub-Contractor’s bill etc.
Achieve Special training on e-GP system.
Supervision of nearest project from Dhaka Head Office.
Also dealing with Officers of Roads & Highways Department, other clients and Consultants.
The Organization is a national Group of Companies. The average annual construction turnover of this company is over Tk.7350 million.
Project Coordinator
M.M. Builders & Engineers Ltd.
Dhaka
01.2014 - 06.2016
Construction of 560 m long PC (Pre Stressed Concrete ) Girder Bridge over Kocha River at Ch. 23520m on Shanuher – Dhamura – Satla via Jolla Road ( ID 506942003) under Uzirpur Upazila, District : Barisal.
Construction of 630 m Long PSC Girder Bridge on Narshingdi-Karimpur Road over Meghna River at Upazlla:-Sadar, District- :- Narshingdi.
Responsible for preparation of cost estimate, making IPC, Supervise to execute all the work according to the design and Drawing.
Solve any discrepancy in drawing by discussion or raising RFI to consultant.
Resident Engineer
M.M. Builders & Engineers Ltd.
Dhaka
01.2010 - 06.2016
Prepared tender documents and cost estimates, contributing to successful project submissions.
Supervised project activities from Dhaka Head Office to ensure compliance with timelines.
Coordinated with Officers of Roads & Highways Department, clients, and consultants to ensure project alignment.
The organization operates as a national company and collaborates with Chinese, Indian, and Malaysian companies in joint ventures.
Contract Manager
M.M. Builders & Engineers Ltd.
03.2009 - 12.2009
Supervise to execute all the work according to the design and Drawing.
Coordinated with subcontractor for timely material supply, facilitating on-schedule work progress.
Prepared billing based on completed work to ensure accurate invoicing.
Prepared daily and monthly work progress reports to track project milestones and performance.
Document daily work variations to maintain accurate records.
Solve any discrepancy in drawing by discussion with RHD Engineer.
Order for materials as work requirement with minimum waste.
The Organization is a national Company. This company works joint ventureally with Chinese and Malaysian companies. The annual turnover of this company over Tk.1000 million.
Project Engineer
Al Ghasaq Building Contracting. L.L.C.
RAK
01.2008 - 01.2009
Supervise to execute all the work according to the design and Drawing.
Managed MEP-related tasks on-site to ensure compliance with project specifications.
Coordinated with subcontractors and material suppliers to ensure timely project progress.
Executed site work by checking shuttering, reinforcement, levels, and layout, facilitating inspections by consultants.
Resolved discrepancies in drawings through discussions or RFIs with consultants.
Instruct site foreman according to the work progress schedule.
Ordered materials to minimize waste.
Al Ghasaq Building Contracting is a local rising building construction company in U.A.E. Basically based on Ras Al Khaimah.
Project Coordinator
M.M. Builders & Engineers Ltd.
12.2005 - 01.2008
Prepared tender documents, estimated project costs, managed variations of bill of quantities, and prepared bills.
Coordinated with the Site Project manager and Site Engineer to monitor project progress.
Collaborated with Roads & Highways Department and consultants to ensure project alignment.
Reviewed site office material requests and submitted verified demands to suppliers for timely procurement.
Attended monthly company meetings and meetings with clients and consultants for project updates.
The Organization is a national Company. This company works joint ventureally with Chinese and Malaysian company. The annual turnover of this company over Tk.1000 million.
Junior Design Engineer
Bongo Dynamic Consult Ltd.
Bangladesh
06.2005 - 11.2005
Structural Design of Regulators Sluices and other water structures including foundation design.
Structural design, drawing, estimates and contract documents of various types of projects/structures.
Supervision of all structures.
Sometimes meet with local person and meeting with them about project.
The Organization is a local consultant of Local Government Engineering Department.
Site Engineer
Premier Cement Mills Ltd.
Bangladesh
02.2005 - 04.2005
Evaluated product usage and gathered client feedback during construction site visits.
Observed production processes and quality control at company factory to ensure standards.
Contributed to a multinational company specializing in cement production and marketing.
Education
B. Sc. Engineering - civil
Chittagong University of Engineering technology (CUET)
Chittagong, Bangladesh
01-2004
Higher Secondary Certificate -
Govt. Majid Memorial City College
Khulna, Bangladesh
01-1998
Secondary School Certificate -
Gazi Memorial High School
Khulna, Bangladesh
01-1996
Skills
Construction management
Project scheduling
Cost estimation
Tender documentation
Cost analysis
Quality assurance
Risk assessment
Feasibility analysis
Subcontractor oversight
Project coordination
Contract negotiation
Client relations
Staff management
Staff supervision
Decision making
Problem solving
Effective communication
Affiliations
Institute of Engineers, M-26057
Projects
EFFECT ON ACIDIC WASTE WATER ON MORTAR AND CONCRETE, Dr. Md. Saiful Islam, Professor, Chittagong University of Engineering and Technology (CUET)
Languages
Well in reading, writing and speaking, Well in reading, writing and fluent in speaking, Well in speaking
Computer Knowledge - Application Software
MS Office
AutoCAD 2004
Personal Information
Father's Name: Md. Mujibur Rahman
Mother's Name: Mrs. Arifa Rahman
Blood Group: O+
Date of Birth: 05/18/1981
Nationality: BANGLADESHI
Marital Status: Married
Timeline
Senior Engineer
Jamil Iqbal Ltd.
11.2023 - Current
Project Coordinator
Wahid Construction Ltd.
06.2019 - 10.2023
Deputy General Manager(Construction)
Wahid Construction Ltd.
07.2016 - 10.2023
Project Coordinator
M.M. Builders & Engineers Ltd.
01.2014 - 06.2016
Resident Engineer
M.M. Builders & Engineers Ltd.
01.2010 - 06.2016
Contract Manager
M.M. Builders & Engineers Ltd.
03.2009 - 12.2009
Project Engineer
Al Ghasaq Building Contracting. L.L.C.
01.2008 - 01.2009
Project Coordinator
M.M. Builders & Engineers Ltd.
12.2005 - 01.2008
Junior Design Engineer
Bongo Dynamic Consult Ltd.
06.2005 - 11.2005
Site Engineer
Premier Cement Mills Ltd.
02.2005 - 04.2005
B. Sc. Engineering - civil
Chittagong University of Engineering technology (CUET)
Senior Engineer at Mott MacDonald UK, association with MM Pakistan (Pvt) Ltd, JPCLSenior Engineer at Mott MacDonald UK, association with MM Pakistan (Pvt) Ltd, JPCL